Factory Visual Gallery

A Glimpse Into Our Advanced Manufacturing Facilities

Production Line

We foam our own PU and PVA sponge materials in-house. The foam is then cut and shaped into packing sponges, eye spears, drainage sponges, wound care sponges, sampling swabs and other products. Further processing and packaging take place in our 1,000-square-meter 100,000-class cleanroom, under ISO 9001 and ISO 13485 quality management systems. Selected products are supplied sterile (gamma irradiation); others are supplied non-sterile as semi-finished products.

OEM/ODM

We provide OEM and ODM services for medical PU and PVA sponges and swabs. No minimum order quantity for standard materials; specially formulated materials (custom density or pore size) may require a minimum order and an additional charge.

Customization options:
• Size and shape
• Color
• Packaging
• Logo printing

How we work:
1. Requirements: you tell us the application and target specifications.
2. Sampling: about 7 days for cut-and-shaped samples; 25–30 days if a new foam mold is needed. If a plastic part such as a handle needs a new mold, the mold alone takes about 35 days, so sampling takes longer.
3. Sample approval: you test and confirm the samples.
4. Mass production: about 15 days after sample approval.
5. Delivery: we pack and ship your order.

Send us your drawings, samples or requirements to start a project.

R&D

We work with customers to develop sponge specifications for their applications. Based on how the product will be used, we adjust material properties such as density, pore size and liquid absorption, and develop new sizes and shapes together with you.


Shenzhen Sponge New Material Co., Ltd factory production line 0